Home / Verified cities / Fort Worth

Fort Worth, Texas stormwater fee

Verified City of Fort Worth Stormwater Utility. Checked on the official page on November 26, 2026.

Tier or classFee per monthPer monthPer year
Tier 1 (0.5 ERU): up to 1,300 sq ft$3.65$3.65$43.80
Tier 2 (1.0 ERU): 1,301 to 2,475 sq ft$7.29$7.29$87.48
Tier 3 (1.5 ERU): 2,476 to 3,394 sq ft$10.94$10.94$131.28
Tier 4 (2.0 ERU): 3,395 sq ft and above$14.58$14.58$174.96

Billing period: per month. Effective: January 1, 2026.

Residential tiers are by square footage per the city FAQ. Non-residential: $7.29 per ERU per month. The city FAQ presents these as the proposed FY26 rates taking effect January 1, 2026; a separate city rate page confirming adoption was not found.

Official source: City of Fort Worth, FAQ on the FY26 Stormwater Utility Fee Increase. Checked November 26, 2026.

Use this rate in the estimator

What the WKU survey lists

Survey fieldWKU survey (2026)
Listed asFort Worth, TX
Billing typeERU (equivalent residential unit)
ERU size2,600 sq ft
Monthly single-family fee$5.75
Year enacted2006

WKU survey (2026), fee may date from 2006, confirm with your utility.

The survey figure of $5.75 a month falls within the official single-family range.

More in Texas

See every survey listing for the state on the Texas stormwater fees page, or other checked cities: Houston, San Antonio, Dallas, Austin, El Paso, Arlington, Corpus Christi.

Estimates only. This site is for planning, not a bill and not legal or financial advice. Survey figures come from the Western Kentucky University Stormwater Utility Survey 2026, which is built from web searches and says it is prone to errors. Many survey fees date from the year a utility was enacted. Verified figures were checked on official city or utility pages on November 26, 2026 and can change at any time. Always confirm with your utility.

By James Johnston. Updated November 2026. See sources and method.