Home / Verified cities / Austin
Austin, Texas stormwater fee
Verified City of Austin Watershed Protection, Drainage Charge. Checked on the official page on November 26, 2026.
Billing period: per month. Effective: FY 2026-27 budget.
The monthly charge is base rate x impervious square feet x an adjustment factor that depends on the share of the lot that is impervious, so the simple estimator cannot match it. Use the city estimator for your lot.
Official source: City of Austin, Drainage Charge. Checked November 26, 2026.
This fee cannot be filled into the estimator automatically. Use the official source and the estimator with your own numbers.
What the WKU survey lists
| Survey field | WKU survey (2026) |
|---|---|
| Listed as | Austin, TX |
| Billing type | ERU (equivalent residential unit) |
| ERU size | 1,763 sq ft |
| Monthly single-family fee | $9.80 |
| Year enacted | 2003 |
WKU survey (2026), fee may date from 2003, confirm with your utility.
The official charge is set by area or formula, so it cannot be compared to the survey's single figure of $9.80 a month without your own numbers.
More in Texas
See every survey listing for the state on the Texas stormwater fees page, or other checked cities: Houston, San Antonio, Dallas, Fort Worth, El Paso, Arlington, Corpus Christi.