Massachusetts stormwater utility fees
Survey data from the WKU Stormwater Utility Survey 2026. Fees may date from the year each utility was enacted (enactment years listed here run from 1998 to 2024). Confirm with your utility.
31Utilities listed
$7.00Median monthly fee (30 with a fee)
$1.48 to $33.00Range of listed monthly fees
Median and range use the 30 listings that show a monthly single-family fee and are not marked repealed. WKU survey (2026), fee may date from the year each utility was enacted, confirm with your utility.
Checked on official pages
- Boston: $9.06 a month
Every Massachusetts listing in the survey
| Utility | Type | ERU sq ft | Monthly fee | Year enacted |
|---|---|---|---|---|
| Boston | ERU (equivalent residential unit) | 2,164 | $8.98 | 2024 |
| Brockton | Fixed (flat) rate | $2.00 | 2020 | |
| Fall River | ERU (equivalent residential unit) | 2,800 | $14.67 | 2008 |
| Newton | Tier system | $8.33 | 2006 | |
| Chicopee | ERU (equivalent residential unit) | 2,000 | $8.33 | 1998 |
| Westfield | Fixed (flat) rate | $6.25 | 2010 | |
| Shrewsbury | Tier system | $7.50 | 2019 | |
| Chelmsford | Tier system | $5.17 | 2017 | |
| Franklin | ERU (equivalent residential unit) | 1,000 | $4.67 | 2022 |
| Dracut | ERU (equivalent residential unit) | 3,000 | $7.00 | 2019 |
| Gloucester | Fixed (flat) rate | $4.42 | 2011 | |
| Wellesley | ERU (equivalent residential unit) | 3,100 | $18.75 | 2024 |
| Northampton | Tier system | $7.85 | 2014 | |
| Milton | Tier system | $20.33 | 2016 | |
| Dedham | Tier system | $15.67 | 2023 | |
| Canton | No information | $7.00 | ||
| Westford | ERU (equivalent residential unit) | 3,500 | $6.25 | 2019 |
| Reading | Two level (residential and commercial) | $3.33 | 2006 | |
| Yarmouth | No information | |||
| Westborough | Impervious area | $19.22 | 2024 | |
| Hudson | ERU (equivalent residential unit) | 3,400 | $8.25 | 2023 |
| Ashland | Impervious area | $2.92 | ||
| Bellingham | ERU (equivalent residential unit) | 3,025 | $8.00 | 2020 |
| East Longmeadow | Land use based | $2.08 | ||
| Longmeadow | Tier system | 3,400 | $1.48 | 2017 |
| Belchertown | Impervious area | $2.40 | ||
| Pepperell | Fixed (flat) rate | $5.00 | 2019 | |
| Rutland | Fixed (flat) rate | $3.33 | 2023 | |
| Ayer | ERU (equivalent residential unit) | 3,200 | $7.92 | 2024 |
| Braintree | ERU (equivalent residential unit) | 2,780 | $5.00 | |
| Millis | Tier system | $33.00 | 2017 |
Source: Campbell, W., Western Kentucky University Stormwater Utility Survey 2026, Appendix A. Every figure: WKU survey (2026), fee may date from the year enacted, confirm with your utility.
Estimates only. This site is for planning, not a bill and not legal or financial advice. Survey figures come from the Western Kentucky University Stormwater Utility Survey 2026, which is built from web searches and says it is prone to errors. Many survey fees date from the year a utility was enacted. Verified figures were checked on official city or utility pages on November 26, 2026 and can change at any time. Always confirm with your utility.